D&G ground floor office
Project length: 6 – 8 months
Converting an empty ground-floor commercial unit into a fully functioning, eye-catching office space
Base floor timber with micro concrete finish
New electrical, plumbing and central heating installations are required for the gas boiler, staff toilets and kitchen
Cast iron radiator installations
Fully conduiated wiring exposed in ceilings and wall areas
Reclaimed colourful light fittings located in areas dotted around the office front to back
Custom-built staff desks and front desks from natural wood also finished in matching micro concrete
Some additional stud walls and false ceilings installed
Final decorating throughout the inside